Levels
Levels and step-up matrix
Six items per level plus one “step-up” line. A step-up must be a concrete change, never an adjective.
L1Entry · Execution · TasksJunior Delivery Engineer / Junior Business Analyst
Delivers one clearly bounded piece of work correctly, inside an existing framework and template.
| Step-up at this level | Baseline: from “can use the tools” to “can hand over one clean piece of work”. |
|---|---|
| Typical scope | Scenarios: A single task inside one scenario (one module, one step, one interface); Systems: 1–2 modules within one system; Stakeholders: Front-line users and a mentor; Horizon: Days to weeks; Budget: No budget ownership |
| Capability marks | Business literacy Guided / Scenario engineering Guided / AI engineering and debugging Guided / Delivery assurance Guided / Delivery engineering Guided |
| Observable evidence |
|
| Deliverables | A working module or configuration · Start-up notes · Failure sample log |
| Metric language | Task-level effort and rework count (minutes / hours) |
| Promotion criteria |
|
| Fast-track | No fast-track at this level. The point is the fundamentals. |
| Common misconception | Mistaking tool fluency for delivery capability. |
| Failure mode | Work is finished but not handed over cleanly: no documentation, no failure samples, the next person starts from zero. |
L2Intermediate · Independent · ScenariosDelivery Engineer / Scenario Delivery Consultant
Owns one scenario end to end: scope, baseline, acceptance, and the system still running afterwards.
| Step-up at this level | From delivering a task to owning an outcome — you start signing your name to a process. |
|---|---|
| Typical scope | Scenarios: One scenario, full cycle (from requirement to live operation); Systems: Data and interfaces across 1–3 systems; Stakeholders: Business owner, front-line staff, IT / data team; Horizon: Weeks to months; Budget: Single-scenario scale, subject to approval |
| Capability marks | Business literacy Independent / Scenario engineering Independent / AI engineering and debugging Independent / Delivery assurance Independent / Delivery engineering Independent |
| Observable evidence |
|
| Deliverables | A running scenario · Acceptance sheet · Failure sample set · First version of the runbook |
| Metric language | Scenario metrics (accuracy, cycle time, handle time, error rate) |
| Promotion criteria |
|
| Fast-track | Equivalent-scale evidence (including acceptance and handover) can skip the task-level review, but never the evidence review. |
| Common misconception | Treating go-live as delivery complete. Go-live is the start. |
| Failure mode | The scenario works but nobody uses it: acceptance measured features, not outcomes. |
L3Advanced · Coordination · Project groupsSenior Delivery Engineer / Senior Scenario Consultant
Coordinates a portfolio of scenarios and resources, turning one hard win into a repeatable playbook.
| Step-up at this level | From doing one well to deciding which ones to do — the first time you hold the trade-off. |
|---|---|
| Typical scope | Scenarios: A portfolio of 3–10 scenarios, with prioritisation and trade-offs; Systems: Cross-system, cross-department orchestration; Stakeholders: Department heads and above, multiple vendors; Horizon: Quarterly; Budget: Portfolio scale, participates in budget planning |
| Capability marks | Business literacy Adaptive / Scenario engineering Adaptive / AI engineering and debugging Adaptive / Delivery assurance Adaptive / Delivery engineering Adaptive |
| Observable evidence |
|
| Deliverables | Scenario portfolio roadmap · Review and operations mechanism · Architecture decision records · Two or more reusable assets |
| Metric language | Portfolio value (total cost, total hours, qualification rate, reuse rate) |
| Promotion criteria |
|
| Fast-track | L4-grade assetisation on a single complex system (reused across 3+ projects) can fast-track, subject to unanimous review. |
| Common misconception | Mistaking meeting volume for coordination ability. |
| Failure mode | Everything in progress, nothing finished: no priorities means no priority. |
L4Lead · System · Organisational systemsLead Delivery Engineer / Head of Scenario Delivery
Designs the delivery system of the organisation: quality gates, assetisation, capability building — outcomes that do not depend on one person.
| Step-up at this level | From delivering yourself to making the organisation able to deliver — output shifts from projects to mechanisms. |
|---|---|
| Typical scope | Scenarios: System design across project groups (10+ scenarios, multiple business lines); Systems: Platform and toolchain, including reuse architecture and quality gates; Stakeholders: Executive sponsors, cross-company partners; Horizon: Six months to a year; Budget: System scale, leads budget preparation |
| Capability marks | Business literacy Systemic / Scenario engineering Systemic / AI engineering and debugging Systemic / Delivery assurance Systemic / Delivery engineering Systemic |
| Observable evidence |
|
| Deliverables | Delivery system and gates · Asset library and reuse metrics · Capability development path · Cross-project retrospective mechanism |
| Metric language | Business language (capital tied up, unit delivery cost, capitalised assets, margin impact) |
| Promotion criteria |
|
| Fast-track | An externally adopted method or standard can enter L5 review directly, with adoption evidence. |
| Common misconception | Mistaking headcount for system capability — the test is whether results survive turnover. |
| Failure mode | Beautifully written policy nobody follows: gates are decorative and problems are still absorbed by heroes. |
L5Expert · Method · Industry methodsDelivery Expert / Scenario Expert
A method adopted beyond one company: standards, ecosystem and cross-enterprise transfer.
| Step-up at this level | From working inside one organisation to outsiders adopting it — judgement moves outside. |
|---|---|
| Typical scope | Scenarios: Cross-industry method output (standards, curricula, open-source assets); Systems: Industry-level methodology and platform ecosystem; Stakeholders: Industry bodies, ecosystem partners, regulators and standards committees; Horizon: One year and beyond; Budget: Ecosystem scale, involves external investment |
| Capability marks | Business literacy Industry / Scenario engineering Industry / AI engineering and debugging Industry / Delivery assurance Industry / Delivery engineering Industry |
| Observable evidence |
|
| Deliverables | Industry standard or methodology · Ecosystem collaboration mechanism · Publicly citable research |
| Metric language | Industry impact (adoption count, ecosystem partners, shift in industry practice) |
| Promotion criteria |
|
| Fast-track | Judged only by external adoption. Self-certification is not accepted; no external evidence means no level. |
| Common misconception | Mistaking speaking volume for influence — influence is others copying the method. |
| Failure mode | Method stays in talks and articles: no external enterprise has actually run it. |
Step-up matrix: five domains × five levels
Read across for a domain’s progression, down for a level’s full picture. If a column looks like the previous one, that level has no real step-up.
Scroll horizontally on small screens.
| Domain | L1 Entry | L2 Intermediate | L3 Advanced | L4 Lead | L5 Expert |
|---|---|---|---|---|---|
| Business literacy | Guided Records the process and roles using a given outline without errors | Independent Runs one process walkthrough alone and states inputs, outputs and owners | Adaptive Spots conflicting metrics and pseudo-requirements, and finds the real bottleneck | Systemic Judges where AI applies on a business line and turns the judgement into a reusable checklist | Industry Publishes an industry problem framework that peers adopt |
| Scenario engineering | Guided Completes scope and acceptance from a template without widening it | Independent Confirms scope, measures the baseline, writes checkable acceptance actions | Adaptive Prioritises a portfolio of scenarios and explains what was dropped | Systemic Defines organisational admission and acceptance standards and enforces them in review | Industry Outputs scenario classification used by outsiders |
| AI engineering and debugging | Guided Reproduces correct and failing output from a given script and records the evidence | Independent Builds a 20+ failure sample set and separates retrieval faults from generation faults | Adaptive Resolves model / data / tool interaction faults and designs the fallback | Systemic Builds evaluation and regression mechanisms and turns quality into a gate | Industry Publishes an evaluation method or quality metric others adopt |
| Delivery assurance | Guided Reports progress and completes handover from a checklist without dropping known risks | Independent Connects data and permissions, explains minimisation and masking, drives pilot and takeover | Adaptive Coordinates dependencies and change, controls scope creep and cost overrun | Systemic Establishes data governance, incident response and delivery quality mechanisms | Industry Contributes to industry delivery or compliance practice |
| Delivery engineering | Guided Collects reusable snippets with instructions others can follow | Independent Produces at least one asset (connector, template, evaluation set) used in a second place | Adaptive Designs the reuse interface, accumulates 2+ assets and measures reuse | Systemic Builds an asset library with reuse metrics and a visible drop in project hours | Industry An asset is adopted by an external company or reused in the open |
Six evidence packs
What must be produced at each level. Any empty pack means the evidence is incomplete.
Scroll horizontally on small screens.
| Evidence pack | L1 | L2 | L3 | L4 | L5 |
|---|---|---|---|---|---|
| Business diagnosis | Records the user process and pain points without missing key roles | Describes the problem in the customer’s metrics and gives a quantified baseline | Separates real pain points from pseudo-requirements across departments | Judges where AI applies on a business line and states the trade-off | Defines an industry problem framework others adopt |
| Scenario and acceptance | Fills scope and acceptance from the template without widening it | Confirms scope, baseline and acceptance actions independently | Ranks a portfolio of scenarios and allocates resources | Defines organisational admission and acceptance standards | Publishes a scenario classification peers cite |
| Data and permissions | Connects data under guidance and does not touch permission settings | Connects data and permissions and explains minimisation and masking | Designs cross-system data flows and permission tiers | Builds data governance and audit mechanisms | Contributes to industry data and compliance practice |
| AI debugging and evaluation | Reproduces both correct and failing output | Builds a 20+ failure set and separates retrieval from generation faults | Designs the evaluation system and handles interaction faults | Builds regression mechanisms and quality gates | Publishes an evaluation method the industry adopts |
| Delivery operations | Hands over from a checklist and reports progress | Drives pilot, acceptance and user takeover | Coordinates dependencies and change, controls scope creep | Builds delivery quality and incident response mechanisms | Advances industry delivery practice |
| Assetisation | Collects reusable snippets and instructions | Produces one reusable asset used in a second place | Designs the reuse interface, accumulates 2+ assets and measures reuse | Builds an asset library with reuse metrics and quantified hour savings | An asset is adopted externally or reused in the open |
Big-tech level ranges
Compiled from public information · not an official mapping · these systems have been reformed repeatedly. Ranges only, no point values.
| Level | Alibaba | ByteDance | Tencent | Baidu | Confidence |
|---|---|---|---|---|---|
| L1 Entry | P4–P5 | 1-1 ~ 2-1 | T1.3–T2.1 | T4–T5 | Medium |
| L2 Intermediate | P5–P6 | 2-1 ~ 2-2 | T2.1–T2.3 | T5–T6 | High |
| L3 Advanced | P6–P7 | 2-2 ~ 3-1 | T2.3–T3.1 | T6–T7 | Medium |
| L4 Lead | P7–P8 | 3-1 ~ 3-2 | T3.1–T3.3 | T7–T8 | Medium |
| L5 Expert | P8–P9 | 3-2 ~ 4-1 | T3.3–T4 | T8–T9 | Low |
Market salary bands
Annual salary in CNY thousands, gross, including bonus, excluding equity. Basis: job postings × 12–15 months, cross-checked against salary reports. Not percentiles, not what any employer pays.
| Level | Suzhou | Hangzhou | Shanghai | Beijing / Shenzhen | Basis |
|---|---|---|---|---|---|
| L1 Entry | 12–20 | 14–23 | 16–26 | 18–30 | Entry to 2 years; derived from job postings at CNY 12k–20k per month |
| L2 Intermediate | 20–33 | 23–38 | 26–42 | 30–48 | 3–5 years; calibrated to the lower bound of the CNY 47k AI integration average |
| L3 Advanced | 32–52 | 36–59 | 42–68 | 48–78 | 5–8 years; includes scenario-owner premium (AI skill premium +62%) |
| L4 Lead | 50–85 | 56–95 | 65–110 | 75–130 | 8+ years; lower half of the senior architect band |
| L5 Expert | 80–130 | 90–145 | 100–170 | 120–200 | Very small sample; anchored to the lower bound of the CNY 1.5–2.0m senior band |
Hangzhou has no separately published band; the figure is an estimate interpolated between Suzhou and Shanghai. All cities use the same job-posting and salary-report basis.
The full self-assessment is currently available in Chinese only. An English question bank is in preparation. Open the Chinese self-check